It is a long-established fact that a reader will be distracted by the readable content of a page when looking at its layout.

Contacts
Project Overview:

CatchMark was asked to assist with the design, implementation, and support of the technology infrastructure for a 95,000-square-foot building that was being built. This included fiber optic splicing and cabling, network cabling, security cameras, sound masking, conference room builds, wireless and wired networking throughout,

 
Project Duration

The planning began in the middle of the year with a planned completion date of 18 months later.

 
Technology Stack
  • Unifi Hardware
    • Cameras
    • Switches
    • Firewall
    • Wireless Access Points
Project Challenges

The availability of materials caused delays throughout this project. Everything from steel for the building to windows. Moving timelines presented challenges as the work we were completing had to be done in coordination with other contractors.

 
Results

CatchMark was able to complete all of our deliverables ahead of schedule and on budget. One key factor in the customer selecting CatchMark for this project was the ability to manage the technical tasks from start to finish.