Project Overview
ITT Gage reached out to CatchMark to assist with refreshing their network equipment. The existing devices were end-of-life and needed to be replaced to prevent a security risk. This needed to be completed in a single afternoon with minimal downtime.
Project Duration
The project planning and coordination took a week, but the execution was completed in a single afternoon, minimizing the Customer’s downtime.
Technology Stack
- Ubiquiti Hardware (Firewall, Switching, Wireless Access Points)
Project Challenges
None
Results
The customer greatly appreciated the speed with which this project was planned, engineered, and executed. Their network is functioning as designed.